tower MEP Project
Modelers: SATABIM
Location: Tehran
Year:2022
Area:75000m2
According to the BIM international standards, the tower MEP project in BIM contains BIM MODELING and Designing Mechanical and electrical in Revitbim modeling and Designing Mechanical and electrical in Revit According to the BIM international standards.
Tower MEP Project challenges
This project has limits for the boiler room space and optimizing the area to have the best placement was critical. Also, there is a need to model each of the facilities of the boiler room family by parameters after mechanical design.
The cft structure in bim is also modeled column and beams families with a connection to get accurate documentation and estimate the steel used in the residential bim project.